Hardwood, laminate, tiling and balustrade work — level, sealed and finished.
No sub-contractors. Our own tradespeople on every job.
The price we quote is the price you pay.
Written 10-year workmanship guarantee on every project.
Can you clad existing stairs with hardwood?
Yes. We overlay existing concrete or timber stairs with solid hardwood or engineered treads.
What flooring is best for Cape Town humidity?
Engineered timber and luxury vinyl handle humidity well. Solid hardwood needs acclimatisation first.
How long does a full-house flooring job take?
A 150m² home typically takes 3–5 days depending on the material.
Do you replace balustrades?
Yes — timber, steel, glass and cable balustrade systems, all compliant with SANS building regulations.
Can you repair a single damaged area?
In most cases, yes. We patch, replace or refinish damaged sections to match the surrounding floor.
Book a free site visit. We inspect, measure and deliver a fixed-price quote within 48 hours.