Full kitchen renovations — from layout design to the last handle and hinge.
No sub-contractors. Our own tradespeople on every job.
The price we quote is the price you pay.
Written 10-year workmanship guarantee on every project.
How long does a full kitchen renovation take?
Typically 3–5 weeks from demolition to handover, depending on size and complexity.
Can I use my kitchen during the renovation?
We set up a temporary kitchen area so you can prepare basic meals throughout the project.
Do you supply appliances?
Yes. We source and install all major brands at competitive trade prices.
What countertop materials do you offer?
Caesarstone, granite, marble, Dekton and solid-surface options — all cut and installed by our team.
Do you handle the plumbing and electrical?
Yes. Licensed plumbers and electricians are part of our in-house team.
Can you work with my own design?
Absolutely. We can build to your architect’s or designer’s specifications.
Book a free site visit. We inspect, measure and deliver a fixed-price quote within 48 hours.